Key Facts |
| Bridge Name | Facility Carried / Feature Intersected | Location | Structure Type | Construction Date / Builder or Contractor |
| Division Avenue Bridge | Division Avenue Over Plaster Creek | Grand Rapids: Kent County, Michigan | Concrete Deck Arch, Stationary | 1914 By: Illinois Bridge Company of Chicago, Illinois |
|
Technical Facts |
| Alteration Date | Structure Length | Roadway Width | Main Spans | Approach Spans |
| 1935 | 50 Feet (15.24 Meters) | 43 Feet (13.1 Meters) | 1 | None |
As trunk line bridges in Michigan go, 1914 is as old as they
can be, since that is when the MSHD began building trunk line bridges for a new
system of state-owned highways. This bridge, was indeed constructed in 1914, and
was the third trunk line bridge to be built in the state!
This bridge is nearly identical, not only in its original design, but in the type of modification that was done to it, to the Vienna Street Bridge. This bridge is a year older than the Division Avenue Bridge. The steel beams that were added to widen the structure were added in 1935. Vienna Street in contrast, was widened in 1959. The Vienna Street Bridge has the benefit of being easier to photograph, thanks to less shrubbery and even a trail leading under the bridge. Perhaps because the modifications to the Division Avenue Bridge were done earlier, the concrete railing posts have slightly different detailing on them than the Vienna Street Bridge, and indeed nearly all bridges in Michigan that use this style railing.
Information and Findings From MDOT
|
![]()
![]()